Skip to main content

DESIGN AND IMPLEMENTATION OF A COMPUTERISED QUALITY CONTROL SYSTEM IN STOCK PRODUCT



ATTENTION:

BEFORE YOU READ THE PROJECT WORK, PLEASE READ THE INFORMATION BELOW. THANK YOU!


TO GET THE FULL PROJECT FOR THE TOPIC BELOW PLEASE CALL:
08168759420, 08068231953

TO GET MORE PROJECT TOPICS IN YOUR DEPARTMENT, PLEASE VISIT:



DESIGN AND IMPLEMENTATION OF A COMPUTERISED QUALITY CONTROL SYSTEM IN STOCK PRODUCT

ABSTRACT
The purpose of the study is to computerize quality control system in production (A case study of Anammco Nig. Ltd Enugu) and to develop a computer packages whereby the technique observed from the manual method can be improved on. It is a known feet that the manual method of quality control in production has been associated with lots of inaccuracy in quality control and this has lead to early break down of parts when in service. The software when developed will facility and enhanced the mode and methods of quality control in spare parts production of Anamco.
TABLE OF CONTENT:
CHAPTER ONE
INTRODUCTION
1.1     Background of the Study
1.2     Statement of the Research Problem
1.3     Objectives of the Study
1.4     Significance of the Study
1.5     Research Questions
1.6     Research Hypothesis
1.7     Conceptual and Operational Definition
1.8     Assumptions
1.9     Limitations of the Study
CHAPTER TWO
LITERATURE REVIEW
2.1     Sources of Literature
2.2     The Review
2.3     Summary of Literature Review
CHAPTER THREE
RESEARCH METHODOLOGY
3.1     Research Method
3.2     Research Design
3.3     Research Sample
3.4     Measuring Instrument
3.5     Data Collection
3.6     Data Analysis
3.7     Expected Result
CHAPTER FOUR
DATA ANALYSIS AND RESULTS
4.1     Data Analysis
4.2     Results
4.3     Discussion
CHAPTER FIVE
SUMMARY AND RECOMMENDATIONS
5.1     Summary
5.2     Recommendations for Further Study
Bibliography
CHAPTER ONE
INTRODUCTION
A quality control system in production management is a qualitative technique with strong financial implications having direct relationships with production, marketing, purchasing and financial politics.
Also, it is a system used in the management of stocks held by any organisation as it concern addition to, storage and removals from the trading stock with appropriates record keeping.

ANAMMCO LTD, Enugu as an assembly plant maintains a large amount of stock vehicles spare parts which are imported from any of her vendors, Vce:- MBAG.  Mercedes Benz AG Germany, MBBRAS.  Mercedes – Benz Brazil or MBE – Mercedes.  Benz Espama for the production line or sales to distributors or authorized agents dealers.
The stock are held for various among which are:-
(a)       To ensure unit sufficient goods are available to meet anticipated demand.
(b)      To provide a better between production processes.
This is, applicable to work in project stocks which effectively decouple operation.
(c)       To meet possible shortage in future
(d)      To absorb seasonal fluctuation in usage or demand.
(e)       To enable production process to flow smoothly and efficiently.
(f)        As a necessary part of the production process.
All these are logical yet, stocks accumulate due to the Less promise worthy reasons which are:-
(a)       Obsolete items are retained in stock
(b)      Poor or non-existing inventory control resulting in over targe orders, replacement orders being out of phase with production etc.
(c)       Inadequate or non-existing stock records
(d)      Marketing departments.
Whether as a deliberate policy or not, sticks, represents an investment by the organization.  Thus, as with any other investment, the cost of holding stock most be related to the benefit to benefit to be gains.  To do this effectively the cost must be identified and this can be done in the three categories:-
(a)       Cost of obtaining stock
(b)      Stock out costs. 
All these spare parts which may how similar menu by description varies greatly among themselves depending on the type or model of vehicle using them.  Thus, the management and operation of stories function and the control of stock on only be performed in on efficient manner when there is an appropriate means of up turning and storing information and a facility for the analysis and use of this information.
In the light of the above, ANAMMCO Ltd Enugu maintains a visible record system returned to as KARDEX, a manual form of inventory control system.
As a prerequisite in any quality control system, ANAMMCO Ltd maintains a peculiar but unique coding system such that all the numerous spare parts are each uniquely coded and identified for accurate and specific information on them.
The operation of the KARDX was often prove to redundancy or duplication of items whenever there is instilling; it requires a lot of paper work with their possible variations or discrepancies during documentation; it involves, so many people thereby investing a lot of man hours; increased cost of procure storage of non-moving or obsolete items leads to customer dissatisfaction due to time wasting and unavailability of information.  Thus, the efficiency of the system is greatly dependent on human factor and as such accuracy.

So, it is an attempt to rectify and modify the above inadquaciets that we have decided to develop and implement on integrated computerized stock control system so as to maximize the operation efficiency, ensure customer satisfaction based on quick. 
Services, minimize the non-hour requirement involved, reduce the running costs, guarantee accuracy and at the same time generate reports that assist management in her decision making as it concerns planning, organizing and controlling.   
BACKGROUND OF THE STUDY (MB-ANAMMCO LTD) ENUGU.
After the recommendation of the fourth (4th) National Development plan in 1975 to increase the number of automobile plants in Nigeria in order to address the problem of transportation, a Mercedes Benz Plant was chosen.  Other reasons for establishing the plant being to:
(a)        Diversification and Rapid industrialization of the Nigeria Economy
(b)        Modernization of industrial workers
(c)         Indigenous man-power training
(d)        Technology transfer and
(e)        Manufacture and Assembly of Mercedes Benz commenced vehicles and trucks in Nigeria.
MB-ANAMMCO LTD, as it is famious by known and called means Mercedes-Benz Anambra motor manufacturing company limited Enugu.  This company is strategically located along IBB A port link Road Enugu Industrial Layout Enugu.
The plant is a joint owned by the Government and people of the federal Republic of Nigeria and Daimier-Benz AG of Germany.  Their share equity is in the ratio 60% to Nigeria and 40% to Daimier, Benz AG Germany.
Therefore Mercedes-Benz ANAMMCO LTD, Enugu was Licensed to manufacture Mercedes Benz commercial vehicles in Nigeria.
The company was incorporated in Nigeria as a private limited liability company on the 17th the day of January 1977.  On the 12th day of May 1978, it’s foundation store was laid by colonel John Atom Kpera the then military Governor of ANAMBRA States (Now, ENUGU and ANAMBRA STATE).  Later on the 8th day of June 1980, Mercedes-Benz ANAMMCO LTD, was commissioned by AlhajiShehu Usman AliyuShagard, the them president Head of state and commander in client of the Nigeria Armed forces; ANAMMCO LTD, commenced production officially on January 1981.  Ever since them her services network is speed throughout Nigeria.  The company uses foreign and local contents in the manufacture of the Mercedes Benz commercial vehicles.-
STATEMENT OF THE PROBLEM
It is a common knowledge that decision makers in any organization require information to perform the great functions of planning, producing and controlling.  Therefore, it is necessary to discover and adequate means of making the information available to every on concerned.  This is because, for decisions to be made correctly, the information must be consistent, accurate, timely and reliable.
Thus, this work is aimed at developing and implementing an integrated computerized quality control system in production of an automobile firm (case study ANAMMCO LTD ENUGU NIGERIA). 
PROBLEMS OF THE STUDY
1.     The encountered when carrying out this study are that obtaining necessary information from staff of Anammco was not easy because some of their information are regarded as company secret.
2.     Production of spare parts on manual approaches has been very difficult.
3.     There may be inadequate or non-existent stock records.
4.     Obsolete items are retained in stock, which makes it difficult for one to know the overall items in stock.
5.     Finally, problem of fund, the economy is bed, so to get money now is difficult.
THE PURPOSE OF THE STUDY
The objectives of this work inadequate the following:
1.     To ensure appropriate stock quality control coding with a view to minimizing stock redundancy or duplication inherent in the manual system of quality control system in production.
2.     To ensure operational efficiency thereby maximizing the customer services level with in level with I menaced accuracy.
3.     To generate consistent, accurate timely and reliable reports that assist the management in her decisions as it affects the stock and the organization for effective pleasing, organizing and controlling.
















AFFILIATE LINKS:
www.nairaproject.com.ng            





Comments

Popular posts from this blog

THE FACTORS RESPONSIBLE FOR PUPILS LATENESS TO SCHOOL IN PRIMARY SCHOOL

ATTENTION: BEFORE YOU READ THE PROJECT WORK, PLEASE READ THE INFORMATION BELOW. THANK YOU! TO GET THE FULL PROJECT FOR THE TOPIC BELOW PLEASE CALL: 08168759420, 08068231953 TO GET MORE PROJECT TOPICS IN YOUR DEPARTMENT, PLEASE VISIT: www.easyprojectmaterials.com www.easyprojectsolutions.com www.worldofnolimit.com THE FACTORS RESPONSIBLE FOR PUPILS LATENESS TO SCHOOL IN PRIMARY SCHOOL ABSTRACT This study was designed to find out those factors that are responsible for pupils lateness to school in Agabi primary school in Orhionmwon Local Government Area of Delta State. The incessant occurrence of chart and some time criminal behaviour not only by the audit population, but also the students of this country in recent times has since began to give cause of concern, particularly to parents, government and school administrators. Questionnaires from a sample of four

AFRICAN STANDBY FORCE: PROSPECTS FOR REGIONAL SECURITY

  ATTENTION: BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!   INFORMATION: YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420       AFRICAN STANDBY FORCE: PROSPECTS FOR REGIONAL SECURITY   TABLE OF CONTENTS CONTENTS                                                        PAGE(S) TITLE PAGE………………………………………………………………   i APPROVAL PAGE………………………………….……………………   ii DECLARATION…………………………………………………….……   iii DEDICATION……………………….……………………………………   iv ACKNOWLEDGEMENT………….………………………….…………   v TABLE OF CONTENTS………………………………………………… vi-ix LIST OF TABLES ……………………………………………………….   x LIST OF FIGURES ……………………………………………………… xi LIST OF ABBREVIATIONS…….……………………………………… xii-xiii ABSTRACT………………………………………………………………… xiv-xv   CHAPTER

MASTERS BUILDING TECHNOLOGY PROJECT TOPICS AND MATERIALS

  MASTERS BUILDING TECHNOLOGY PROJECT TOPICS AND MATERIALS     ATTENTION: BEFORE YOU READ THE PROJECT TOPICS BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!   NOTE: WE WILL SEND YOU THE ABSTRACT, TABLE OF CONTENT AND CHAPTER ONE OF YOUR APPROVED TOPIC FOR FREE. CHOOSE FROM THE LIST OF TOPICS BELOW. SEND YOUR EMAIL ADDRESS AND THE APPROVED PROJECT TOPIC TO ANY OF THESE NUMBERS-08068231953, 08168759420   WE WILL THEN SEND THE ABSTRACT, TABLE OF CONTENT AND CHAPTER ONE FOR FREE   NOTE ALSO: WE CAN ALSO DEVELOP THE FULL PROJECT WORK CALL: 08068231953, 08168759420       MASTERS BUILDING TECHNOLOGY PROJECT TOPICS AND MATERIALS     APPRAISAL OF MODERN STRATEGIES FOR HOUSING DELIVERY IN NIGERIA FINANCIAL AND NON-INCENTIVES: IDENTIFYING FACTORS FOR JOB MOTIVATION VIETNAM IMPORTANCE OF INCENTIVES AND MOTIVATION HUMAN ELEMENT IN CONSTRUCTION INDUSTRY LABOUR PRODUCTIVITY ANALYSIS USING MULTI-VARIABLE LINEAR REGRESSION TECHNIQUE DELAY ANALYSIS I