Skip to main content

THE IMPACT OF MANAGEMENT CHALLENGES ON THE PRODUCTIVITY OF INTEGRATED BUILDING TECHNOLOGY AND SERVICES LTD

 

ATTENTION:

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

 

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

 

 

 

THE IMPACT OF MANAGEMENT CHALLENGES ON THE PRODUCTIVITY OF INTERGRATED BUILDING TECHNOLOGY AND SERVICES LTD

 

ABSTRACT

The research is an explanatory attempt to study and analyse “the impact of management challenges on the productivity” with special references to intergrated Building Technology and Services Limited. The objective of this project is to determine various ways through which these challenges can be faced and checked, recommend at the end of the study the best way to counter such  challenges. The method of data collection is through personal interview, questionnaires and observation methods. The findings of the study are people refuse to recognized such enterprises by not pratronizing their product in large market due to some reasons and similarly inadequate funding by the appropriate authority which hinder the activities of the organisation. The major conclusion is that government should realize that small and medium scale industries have made a lot of contribution to the Nigeria economy and reducing the rate of unemployment  and over dependence on government jobs. Based on the findings and conclusion the researcher recommends that the government should provide adequate financial assistance to the organisation to face challenges that may occur to their productivity.


TABLE OF CONTENT

Title page- -       -       -       -       -       -       -       -       -       i

Declaration -       -       -       -       -       -       -       -       -       ii

Approval pages   -       -       -       -       -       -       -       -       iii

Dedication -       -       -       -       -       -       -       -       -       iv

Acknowledgement-     -       -       -       -       -       -       -       v

Abstraction-       -       -       -       -       -       -       -       -       vi

Table of content -       -       -       -       -       -       -       -       vii

CHAPTER ONE

Introduction       -       -       -       -       -       -       -       -       1

1.1        Background of the study      -       -       -       -       -       1

1.2        Statement of the problem    -       -       -       -       -       4

1.3        Objective of the study -       -       -       -       -       -       5

1.4        Significance of the study      -       -       -       -       -       5

1.5        Research question and hypothesis -       -       -       -       7

1.6        Scope of the study      -       -       -       -       -       -       8

1.7        Limitation of the study -       -       -       -       -       -       8

1.8        Definition of the terms -       -       -       -       -       -         9

CHAPTER TWO

Literature Review

2.1        Introduction-      -       -       -       -       -       -       -           10

2.2        Management and administration in a small

 and medium scale enterprises      -       -       -       -           12

2.3        Management profile in a small and medium

scale enterprises   -     -       -       -       -       -       -          13 

2.4        Problems of marketing management in a small

 and medium scale enterprises      -       -       -       -       -  19 

2.5        Operations management in a small and

medium scale enterprise      -       -       -       -       -       27

CHAPTER THREE

3.1        Introduction       -       -       -       -       -       -       -       32

3.2        Research design -       -       -       -       -       -       -       33

3.3        Area of study     -       -       -       -       -       -       -       33

3.4        Population of study-    -       -       -       -       -       -       33

3.5        Sample size and sampling techniques-   -       -       -       34

3.6        Instruments for data collection      -       -       -       -       34

3.7        Validation of instrument       -       -       -       -       -       35

3.8        Reliability of instrument       -       -       -       -       -       35

3.9        Method of data collection     -       -       -       -       -       36

3.10    Method of data analysis       -       -       -       -       -       36

CHAPTER FOUR

Data Presentation and Analysis    

4.1        Introduction       -       -       -       -       -       -       -       37

4.2        Characteristics of respondents      -       -       -       -       37

4.3        Data presentation and analysis     -       -       -       -       40

4.4        Test of hypothesis      -       -       -       -       -       -       46

4.5        Summary of discussion of findings -       -       -       -       50

CHAPTER FIVE

Summary, Conclusions and Recommendations

5.1        Summary   -       -       -       -       -       -       -       -       52

5.2        Conclusion -       -       -       -       -       -       -       -       54

5.3        Recommendations      -       -       -       -       -       -       55

Reference  -       -       -       -       -       -       -       -       57

Appendix   -       -       -       -       -       -       -       -       58



CHAPTER ONE

INTRODUCTION

1.1    BACK GROUND OF THE STUDY

Modern man’s aims and aspirations call for unprecedented co-operative effort out capacity to build the slimes to criminate pollution, to give individuals an opportunity for self expression to raise the standard of living, and to achieve our many other social and personal objectives rest on joint activity if individuals or eventribes attempt to be self sufficient producing their own food, clothing and shelter subsistence is a meager at best. But when men join together in various enterprises, pooling their resources and exchanging their outputs with many other people or enterprises, the grap the means to flourish.

The job of management is to make such cooperatives endeavours function properly. Managers are needed to convert disorganized resources of men, machines, and money into useful enterprises can render mobilize the required means of production, and the outside would, and inspire people associated with the enterprise to work toward the common objective. The fact the government of Nigeria can not provide employment to its citizens makes it necessary for many people to come up with the idea of being self employed.

This trend is a welcome development in Nigeria considering the level of our population. Integrated building product and service limit Liability Company in 1988 with a 100% Nigeria participation. At inception it had a normal share capital of N 1000,000.00 (one million naira) the company was set up basically to produce building product and services that with industrialize the nation and create employment opportunity. The setting of the company in Kaduna was based on the need to establish it new Abuja the federal capital where lot of construction is going on. Beside for a growing the initial cash of setting up in Abuja was on  high side.

Kaduna right now is live a satellite town for many resident of Abuja especially those in the building industry and so marketing the organization product was done during the weekend when the professionals who serve as a link between the prospective client of the organization are around.

The organization started full operation in 1989 with an office accommodation on Ahmadu Bello way a factory accommodation in Sabo a suburb in Kaduna, three official car twelve permanent staff (which includes four management staff) and about thirty contract staff. The company act inception had an installed capacity to produce 160 windows and 78 doors in a week. The staff strength has also grown the 47 permanent staff and over 500 contract staff, the organization has also gone into consultancy construction (renovation, remodeling) wood and mental fabrication.

The product ranges of the organization are:

Integrated sliding windows

Integrated projected windows

Integrated sliding doors

Integrated curtain willing system

Integrated rooting system

Integrated sky lighting

Wood work and mental construction.

1.2  STATEMENT OF THE PROBLEM

Many organizations are faced with management challenges especially small and medium scale enterprises. These challenges are both form within and outside the organization. These are some of the problems to assume.

 

1.   People refuse to recognized such enterprises by not patronizing their product not because they are of less quality but because they are made by small or medium scale enterprises, considering brand names, and unacceptability of  the product in large market etc.

 

2.   The financial institutions are very weak in assisting small and medium scale enterprise challenges of  running the business.

 


1.3   OBJECTIVES OF THE STUDY

The researcher decided to write on this topic so as to determine particular problems facing productivity of integrated Building Technology and services limited.

Another objective is to determine various ways through which these challenges can be faced and checked.

Finally to recommend at the end of the study the best way to counter such challenges.

1.4   SIGNIFICANCE OF THE STUDY

The researcher decided to write on the subject because of its importance to the over all objectives of organizations, especially productivity of integrated Building technology and services Ltd particularly. Those ones that aims at encouraging the owners of such business not to relent.

The researcher’s work will equally help the national association of small scale industries (NASSI) and the promoters of small and medium enterprises (SME) to know where exactly to channel their campaign for the sustenance and survival of small and medium scale enterprises.

The write up will also enable the writer to broaden his knowledge and serve as a basic development as the writer is planning to become self employed in future.

I will also enlighten financial institutions most especially those on  the private sector  to understand the need  to give access to funds to small and medium scale enterprises, in addition to government owners of financial institutions like Bank of industries (BOI) and Nigerian agricultural cooperation  and rural development bank who are formed for such purposes but can not meet up with the request because of the high rate of enterprises that are applying to get such funds.

It is also believed that the write up will serve as a source of information for those who want to go into similar business on what to expect and how to face it.

Also for student who want to write on similar topic and to management and staff of the organization integrated building product and services limited.

Finally the research work is important to the writer as it being carries out in partial fulfillment for the requirement of the award for Higher National Diploma in Business Administration from Kaduna polytechnic Kaduna.

1.5    HYPOTHESIS

This is a realistic statement that cannot, the relationship or level of significance between two or more variables.

In the light of this the research has formulated the following hypothesis for the study.

HO: Integrated building technology and services limited is faced with challenges and those challenges has hindered its growth and development.

H1: integrated Building technology and services limited is faced with challenges and have all the opportunities to grow and expand.

1.6   SCOPE OF THE STUDY

The research work will cover the impact of management challenges, this is because more often than not there is usually the owners and even members of management who deal with external and internal environment who really are the burden the ability an so on. Then on the pay level of employee on how to motivate them to work hard, so that they will be willing to conform any challenges that might occur in the productivity of Intergrated Building technology and services Ltd.

1.7   LIMITATION OF THE STUDY

In carrying out any research work which involve information gathering from primary sources and secondary source, one is bound with the problems which limit the achievement of the objectives.

Time factor was one of the limitation the time did not seems to be enough for uses, the short time available was extremely utilized.

Another limitation the research went through was that of getting feedback from the respondent and when the information was finally getting then the problem of scouting also arises.

Lack of textbooks also coursed a  problem to  the  researcher and where the textbooks, were lucky seen their prices was out of the researchers reach.

1.8    DEFINITION OF THE TERM

The following are some terms use in this research work:

(i)                  National association of small scale industries (NASSI)

(ii)                 Small and medium enterprises. (SME)

(iii)               Bank of industries (BOI)

(iv)               Nigerian agricultural cooperation and rural development bank. (NACRDB) 

 

HOW TO GET THE FULL PROJECT WORK

 

PLEASE, print the following instructions and information if you will like to order/buy our complete written material(s).

 

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

 

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

 

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

 

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

 

 

 

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

 

 

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/

https://foreasyprojectmaterials.blogspot.com.ng/

https://mypostumes.blogspot.com.ng/

https://myeasymaterials.blogspot.com.ng/

https://eazyprojectsmaterial.blogspot.com.ng/

https://easzprojectmaterial.blogspot.com.ng/

 

 

 

Comments

Popular posts from this blog

THE FACTORS RESPONSIBLE FOR PUPILS LATENESS TO SCHOOL IN PRIMARY SCHOOL

ATTENTION: BEFORE YOU READ THE PROJECT WORK, PLEASE READ THE INFORMATION BELOW. THANK YOU! TO GET THE FULL PROJECT FOR THE TOPIC BELOW PLEASE CALL: 08168759420, 08068231953 TO GET MORE PROJECT TOPICS IN YOUR DEPARTMENT, PLEASE VISIT: www.easyprojectmaterials.com www.easyprojectsolutions.com www.worldofnolimit.com THE FACTORS RESPONSIBLE FOR PUPILS LATENESS TO SCHOOL IN PRIMARY SCHOOL ABSTRACT This study was designed to find out those factors that are responsible for pupils lateness to school in Agabi primary school in Orhionmwon Local Government Area of Delta State. The incessant occurrence of chart and some time criminal behaviour not only by the audit population, but also the students of this country in recent times has since began to give cause of concern, particularly to parents, government and school administrators. Questionnaires from a sample of four

AFRICAN STANDBY FORCE: PROSPECTS FOR REGIONAL SECURITY

  ATTENTION: BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!   INFORMATION: YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420       AFRICAN STANDBY FORCE: PROSPECTS FOR REGIONAL SECURITY   TABLE OF CONTENTS CONTENTS                                                        PAGE(S) TITLE PAGE………………………………………………………………   i APPROVAL PAGE………………………………….……………………   ii DECLARATION…………………………………………………….……   iii DEDICATION……………………….……………………………………   iv ACKNOWLEDGEMENT………….………………………….…………   v TABLE OF CONTENTS………………………………………………… vi-ix LIST OF TABLES ……………………………………………………….   x LIST OF FIGURES ……………………………………………………… xi LIST OF ABBREVIATIONS…….……………………………………… xii-xiii ABSTRACT………………………………………………………………… xiv-xv   CHAPTER

MASTERS BUILDING TECHNOLOGY PROJECT TOPICS AND MATERIALS

  MASTERS BUILDING TECHNOLOGY PROJECT TOPICS AND MATERIALS     ATTENTION: BEFORE YOU READ THE PROJECT TOPICS BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!   NOTE: WE WILL SEND YOU THE ABSTRACT, TABLE OF CONTENT AND CHAPTER ONE OF YOUR APPROVED TOPIC FOR FREE. CHOOSE FROM THE LIST OF TOPICS BELOW. SEND YOUR EMAIL ADDRESS AND THE APPROVED PROJECT TOPIC TO ANY OF THESE NUMBERS-08068231953, 08168759420   WE WILL THEN SEND THE ABSTRACT, TABLE OF CONTENT AND CHAPTER ONE FOR FREE   NOTE ALSO: WE CAN ALSO DEVELOP THE FULL PROJECT WORK CALL: 08068231953, 08168759420       MASTERS BUILDING TECHNOLOGY PROJECT TOPICS AND MATERIALS     APPRAISAL OF MODERN STRATEGIES FOR HOUSING DELIVERY IN NIGERIA FINANCIAL AND NON-INCENTIVES: IDENTIFYING FACTORS FOR JOB MOTIVATION VIETNAM IMPORTANCE OF INCENTIVES AND MOTIVATION HUMAN ELEMENT IN CONSTRUCTION INDUSTRY LABOUR PRODUCTIVITY ANALYSIS USING MULTI-VARIABLE LINEAR REGRESSION TECHNIQUE DELAY ANALYSIS I